Cameron Park has no city government of its own — it’s unincorporated El Dorado County, and the county’s Planning and Building Dept, Building Division is the permitting authority for any demolition here, pool removal included. That’s the same desk that covers El Dorado Hills and Shingle Springs, so the permit process itself isn’t unique to Cameron Park. What is worth knowing locally is the Cameron Park Community Services District, which maintains architectural controls across parts of the community. That review sits alongside the county building permit rather than replacing it, and it more often touches what gets built or placed in the yard afterward — a new patio, a fence line, a structure — than the below-grade demolition itself. Still, it’s a second desk worth checking early rather than assuming the county permit is the only box to check. Like the rest of the county’s foothill communities, expect shallower soils over weathered granite and a lot that isn’t uniformly flat. Conditions vary lot to lot, and rock below the shell can change the job.

Plate 01—Final Grade/Illustrative
Short answer
Cameron Park is unincorporated, so El Dorado County Planning and Building Dept, Building Division issues the demolition permit for pool removal — 530-621-5315, not a city hall. Parts of the community also fall under Cameron Park Community Services District architectural controls, which can add a separate review step alongside the county permit.
Jurisdiction
Who issues the permit.
There is no City of Cameron Park. Cameron Park is an unincorporated community, which means it has no city council, no city building department and no permit counter of its own. A pool demolition here is permitted by El Dorado County Planning and Building Department, Building Division.
This trips people up constantly, and it costs real time — calls to a city that does not exist, and search results confidently naming one. If your mailing address says Cameron Park, your building department is El Dorado County.
El Dorado County does not publish a handout specific to swimming pool demolition. That is not a problem with your project — it means the scope is set against the general demolition permit and what the building official asks for on your lot, rather than against a printed checklist. Two jurisdictions in our service area do publish one, and we say which on the permits page.
Two permitting desks here, not one — the county issues the demolition permit, the CSD may weigh in on what goes in after.
On File
Cameron Park at a glance
- Jurisdiction type
- Unincorporated community of El Dorado County
- County
- El Dorado County
- Permit counter
- 530-621-5315
- Air district
- El Dorado County Air Quality Management District
- Pool-specific guidance
- None published — general demolition permit applies
- Ground
- Sierra foothill
Source: El Dorado County Planning and Building Department, Building DivisionEl Dorado County Air Quality Management District, Air Quality Management DistrictVerified August 22, 2026. Permit requirements change — confirm with the department before relying on this for your property.
Local Overlays
What else applies here.
A demolition permit is rarely the only rule touching a backyard project. These are the ones published for Cameron Park that genuinely affect how a pool removal runs.
Septic and well setbacks
Unincorporated El Dorado County parcels commonly run on septic and, further out, private wells, both administered by county Environmental Management. That matters for a pool removal in two practical ways: a leach field is not something to drive a loaded truck across, and fill and drainage design has to account for what is already in the ground nearby.
Source: El Dorado County Environmental Management, Environmental Management — septic and well programsVerified August 22, 2026. Permit requirements change — confirm with the department before relying on this for your property.
Community Services District design review
The Cameron Park Community Services District maintains architectural controls in parts of the community, which can add a review step alongside the county building permit. It rarely touches a below-grade demolition, but it can touch what you build or place afterwards — worth knowing before the yard is finished, not after.
Source: El Dorado County Planning and Building Department, Building DivisionVerified August 22, 2026. Permit requirements change — confirm with the department before relying on this for your property.
Site Conditions
The ground, the gate and the truck.
Sierra foothill ground
This is Sierra Nevada foothill ground — shallower soils over weathered granite, and slopes that rarely give you a flat place to stage. Two consequences for a pool removal: rock can change the equipment and the schedule once you are below the shell, and grading has to be designed for a lot that already sheds water somewhere, so the finished surface drains the way the lot always did rather than sending it at a structure. Conditions vary parcel to parcel.
Access and equipment
Cameron Park lots vary more than people expect — some sit on generous, gently sloped parcels, others are tucked behind narrower access with a tighter gate run. We walk the actual route from street to pool before sizing equipment rather than assuming either extreme, checking gate widths, any fencing the excavator has to clear, and where a haul truck can realistically stage. If Community Services District architectural review is going to touch anything visible from the street — new hardscape, a fence, a structure going in later — that’s worth raising during the same walk-through, since it’s a separate process from the county demolition permit and easy to miss if nobody flags it up front.
Hauling and disposal
Pool shells generate concrete, gunite and rebar in volume, and California’s CALGreen code sets a 65% diversion baseline for construction and demolition debris statewide, which applies to a Cameron Park removal the same as anywhere else in the county. El Dorado County falls under the El Dorado County Air Quality Management District for dust and debris-related air quality matters on a demolition site. As with any excavation in California, Government Code Section 4216 requires an 811 utility notification first, with a two-working-day wait before digging is legal — that clock is separate from and unaffected by the county’s building permit timeline.
Two Ways To Do It
Partial fill-in or full removal.
The mechanics are the same everywhere. What changes in Cameron Park is the department reviewing it and what they want to see — which is why this decision is worth making before anyone files anything.
| Criterion | Partial fill-in | Full removal |
|---|---|---|
| What comes out | The upper portion of the shell — typically the walls and bond beam. | The entire shell, hauled off the property. |
| Drainage | Openings are cut through the remaining base so water passes rather than collecting. | No shell remains, so there is no bowl to drain. |
| Fill | Approved fill placed and compacted in lifts over the remaining base. | The open excavation backfilled and compacted in lifts. |
| Future structures | Generally not intended to carry a structure. Concrete stays in the ground. | Generally the option when a structure may go on the footprint later. |
| Disclosure on sale | Buried concrete is a known condition a seller generally discloses. | Fewer questions, because nothing was left behind. |
| Access and cost pressure | Less material to move, so tight access hurts less. | More material out and more fill in, so access matters more. |
Field Sequence
How the Guys handle it.
- 01
Site Walk
We visit the property and look at access, utilities, slope and what is actually in the ground.
- 02
Clear Plan
We recommend partial or full removal for your plans, and put the scope, sequence and timing in writing.
- 03
Permits & Prep
We prepare and coordinate the permit paperwork with your local building department and stage the site.
- 04
Removal
We demolish the shell to the approved scope and haul the debris off the property.
- 05
Backfill & Grade
We place approved fill, compact it in lifts, and finish to a graded surface ready for what comes next.
Asked In Cameron Park
Pool removal in Cameron Park — common questions.
No. Cameron Park is unincorporated El Dorado County, so there’s no city building department. The county’s Planning and Building Dept, Building Division issues the demolition permit at 530-621-5315 — the same office that covers El Dorado Hills and Shingle Springs. There’s a second, separate desk worth knowing about locally: the Community Services District.
The CSD maintains architectural controls across parts of Cameron Park, which is a separate review from the county building permit. It rarely touches a below-grade pool demolition itself but can apply to what gets built or placed in the yard afterward, so it’s worth checking alongside the county permit rather than assuming one covers the other for your specific parcel.
The demolition itself is permitted through El Dorado County. Whether CSD architectural review applies depends on what you’re planning for the space afterward and where your parcel sits within the district’s boundaries — that’s a question for the CSD directly rather than something we can answer as a blanket rule.
El Dorado County hasn’t published one. Scope runs off the general demolition permit and what the building official asks for on your parcel — and in Cameron Park, potentially what the CSD asks for if architectural review applies — rather than a fixed pool-specific checklist that covers every property the same way.
Often, yes, on the access and staging side — more room generally means more space for equipment and a haul truck to work without a tight gate-and-slope squeeze. It doesn’t change the permit process itself, which still runs through the same county desk and, where applicable, the same CSD review regardless of parcel size.
Many unincorporated parcels in the county do, administered by county Environmental Management. If the property has a septic system, we account for what’s already in the ground before routing equipment near it, without assuming a specific setback distance applies to every lot — that’s confirmed case by case, on-site, before anything is scheduled.
California Government Code Section 4216 requires an 811 utility notification before excavation begins, with a minimum two-working-day wait after that notification before digging can legally start. That requirement is statewide and applies regardless of the county permit or any CSD architectural review that might separately apply to the property or the parcel.
Next Door
Nearby areas we cover.
Jurisdiction lines around Cameron Park do not follow the way the area actually reads on the ground. If your property sits near one of these, it is worth confirming which department your address falls under before anyone files anything.
- Pool removal in Shingle Springs
Unincorporated — permits through El Dorado County.
- Pool removal in El Dorado Hills
Unincorporated — permits through El Dorado County.
- Pool removal in Placerville
Permits through the City of Placerville.
- Pool removal in Folsom
Permits through the City of Folsom.
Read Next
Before you decide.
What pool removal costs
The conditions that move the number, and why nobody quotes one from a map.
Permits by jurisdiction
How El Dorado County compares to the other departments in the region.
Backfill, compaction and grading
The half of the job that decides whether the ground behaves in five years.
Compare partial and full removal
The full side-by-side, including what each does to your options later.
How a removal runs
Site walk, plan, permits, demolition, backfill and grade — in order.
Removing a pool to build
What an ADU or addition over the old footprint actually requires.
Get On The Schedule
Start with a site walk in Cameron Park.
We look at access, utilities, slope, depth and what is actually in the ground, then tell you which option fits what you are planning and put the scope in writing. No number gets quoted from a map.
If your property sits near a jurisdiction line, say so — settling which department covers your address is the first thing worth getting right, and it is free to check.